My dad and I cut down three pine trees. We used his new sawmill to cut about 72 studs, several 2x4x16's, and 1x6's. The lumber will take about 3 months to dry. In the mean time, the foundation of the shop will be built with 2x6 boards that used to be part of my deck. I'll also have to take my old boat trailer and convert into a utility trailer.
Wednesday, January 2, 2008
The trees come down.
My dad and I cut down three pine trees. We used his new sawmill to cut about 72 studs, several 2x4x16's, and 1x6's. The lumber will take about 3 months to dry. In the mean time, the foundation of the shop will be built with 2x6 boards that used to be part of my deck. I'll also have to take my old boat trailer and convert into a utility trailer.
Subscribe to:
Posts (Atom)